Case Study

Repurposing Pontoons to Create Drydock GC 4500 for Gulf Copper

Client

Gulf Copper

A full service shipyard in Galveston, TX, operating several dry docks of varying sizes from 1,900 LT to 35,000 LT an existing 15,000 LT (Longton) drydock.

Project Overview

Gulf Copper was looking for a dry dock to service 2,500 LT vessels (≈ 200 ft length). Gulf Copper asked Sealy Technical Services (STS):

Challenges:

Cost Prohibitive
Operations

Gulf Copper lacked an economical solution for docking 2,500 LT vessels, a very common vessel size along the Gulf Coast.

Aging
Infrastructure

The candidate pontoons had worked as deck barges for years; their wingwalls had been cut away.

Tight
Footprint

New dock had to fit the existing slip and integrate with yard utilities without disrupting current production.

STS Scope of Work

  • Evaluate pontoons’ residual strength and define the 4,500 LT lift envelope. 
  • Engineer new steel wingwalls and internal framing.
  • Design a third pontoon to connect the original pontoons.
  • Complete scantlings, and provide pump/ballast rooms.
  • Generate CAD models for visualization of the new dock and drawings for construction.

Solutions & Innovations

Hydrostatics for new hull geometry

Orca3D model with MS Excel postprocessing for freesurface corrections and shell/bulkhead ΔP envelopes.

Rapid stiffener layout for new wingwalls

Parametric modeling and scripts for autogenerated longitudinal & transverse members; export fed directly to detailing.

Connecting legacy pontoons

Structural and hydrostatic calculations for verify the design of the new middle section.

United States Coast Guard - Dry Dock Certification

Certification

The dry dock would need to be designed so that it can be certified in accordance with the USCG requirements for floating steel dry docks.

Results

Client Testimonial

“STS transformed surplus pontoons into a modern, fitforpurpose drydock. Their modeling accuracy and pragmatic fabrication details let our crews assemble GC 4500 on schedule and under budget. We’re already booking jobs that we previously turned away.”

— Yard Manager, Gulf Copper

Key Takeaway

Reengineering existing assets can unlock substantial CAPEX savings. By combining advanced analysis with rapid BIMdriven detailing, STS delivered a drydock that matches Gulf Copper’s target market, lowers docking costs, and creates a new profit center—all without expanding the yard’s footprint. 

Contact Us

Fill out the form below and tell us a bit about your vessel, dock, or idea. 
We will get back to you shortly and get your project started.

No phone mazes, no runaround — just real engineers with real answers.

We look forward to hearing from you.